The 15,000-bottle-per-hour carbonated beverage production line customized by Zhangjiagang Duocheng Beverage Machinery for Mali customers has been successfully delivered and entered the on-site installation and commissioning stage.
This carbonated beverage production line has a complete production line from water treatment system, beverage blending system, bottle blowing system, filling machine, labeling machine, packaging machine, and after installation and commissioning, it can produce products. Customers do not need to purchase any additional equipment, which saves time and effort for customers. The mixer in the carbonated beverage production line can accurately control the injection amount of carbon dioxide to ensure that each bottle of carbonated beverage can achieve the ideal bubble effect. The filling system not only has a fast filling speed, but also has extremely high precision, which eliminates liquid waste and overflow, and greatly improves production efficiency. At the same time, the production line is also equipped with an intelligent control system with a simple and intuitive operation interface. Customers only need to tap the screen to easily control the entire production process, realize automated and intelligent production, and greatly reduce labor costs and operating difficulties.
In order for customers to produce products and make profits as soon as possible, our technicians work day and night on the front line of installation and commissioning. Overcoming language communication barriers and high temperatures, carefully calibrating each device and optimizing each parameter, just to make the production line run smoothly as soon as possible.
Installation And Commissioning Site For Mali Customers
Apr 02, 2025
Leave a message