Bottled water production process

May 16, 2024 Leave a message

Process of bottled water production line
Container preparation: Raw materials and consumables required for bottled water filling production line. Bottle embryo, bottle cap, label, packaging film or carton
Water treatment system: After tap water or groundwater passes through the water treatment system, it reaches the drinking water standard
Blowing machine Make plastic bottles, connect the blowing machine and the filling machine through air conveying, and use wind power to send the prepared bottles to the filling machine
Pure water filling machine: The prepared drinking water is filled into bottles through the filling machine. The filled bottled water is transported to the labeling machine through conveying
Labeling machine Put labels on the filled bottled water and transport it to the laser coding machine through conveying
Laser coding machine: After printing the production date on the bottled water, it is transported to the packaging machine for packaging
Heat shrink film packaging machine The finished bottled water is packaged, and one package can be 24 bottles, 12 bottles, 15 bottles, adjusted according to demand
Palletizer: The output of the pure water production line is large, and the palletizer can be configured according to demand to stack the packaged products for easy transportation. At this point, the product production is completed